Skip to priority announcement. Skip to main content

Power Electrics is Proudly Employee Owned

Subsea Cable Installation

The Challenge

To supply two 1250kVA generators to power subsea cable installation equipment for a global submarine communications company.

 

The Solution

With this challenge in mind, the Power Electrics team came up with the perfect solution. The generators were loaded on to the boat using dock cranes, shipped over to the site and put into action.

The two 1250kVA generators provided power for the motor reels that are used to lay the cable and were set to work in ‘Runner – Standby’ configuration, meaning that power would not be lost in the event of a fault with one of the generators. 

Bespoke service packs were also provided to enable regular on board maintenance.

“The success of this project can be attributed to excellent project management and the engineering that went into manufacturing the bespoke generator units. We’re always happy to take on unique challenges that require purpose built solutions.” 
Lee Sharp, Regional Sales Manager