Water Utility
The client required a complete solution to assist in the removal of gravel from the reservoir roof. In total a series of 9 conveyors enabled the most efficient method of relocating the gravel which allowed a maintenance team to access the concrete reservoir roof. Due to no access to main electricity, Power Electrics provided three 60kVA trailer mounted generators complete with cables and distribution in order to provide temporary power.
To see a drone video of the conveyors and generator follow this link.